PSN-L Email List Message

Subject: Lehman
From: "Bryan&Regina Goss" bgoss@..................
Date: Tue, 12 Jun 2001 13:28:56 -0500


I have read that a ball bering was used in place of a knife edge in the =
construction of the Lehman by some people.
I used the knife edge, but have problems with it when trying to adjust, =
It seems to want to tilt then the boom does not have =3D swing in my =
case east and west. In most of my data one side has just a bit more =
amplitude than the other maybe 10% or less.
If I use a ball bering would this problem be corrected or is this normal =
to see my construction go here :http://www.1goss.com/seis.htm








I have read that a ball bering was used = in place of=20 a knife edge in the construction of the Lehman by some = people.
I used the knife edge, but have = problems with it=20 when trying to adjust, It seems to want to tilt then the boom does not = have =3D=20 swing in my case east and west. In = most of my=20 data one side has just a bit more amplitude than the other maybe 10% or=20 less.
If I use a ball bering would this = problem be=20 corrected or is this normal to see my construction go here :http://www.1goss.com/seis.htm<= /FONT>
 

[ Top ] [ Back ] [ Home Page ]

Larry Cochrane <cochrane@..............>