PSN-L Email List Message

Subject: RE: lehman seismometer
From: "Gary Lindgren" gel@.................
Date: Sun, 14 Nov 2010 08:52:08 -0800


Hello Bryan,

Can you show us 24 hours of data. Do the seismometer support posts  go
directly to the garage floor or are they on the insulating mat. You can make
small holes in the mat for the support posts if you have not done that
already. Your seismometer looks good so far. Good work.

Gary

 

 

 

 

 

From: psnlist-request@.............. [mailto:psnlist-request@...............
On Behalf Of Bryan Goss
Sent: Saturday, November 13, 2010 11:53 PM
To: psnlist@..............
Subject: lehman seismometer

 

I have built a new lehman seismometer and I have a few questions its been
several years since my last one and I have forgotten a lot.

A. I have a small outdoor building not temperature controlled thats why I
built the wooden box with insulation.
I am getting noise starting about 1:00am to about 9:00am 
should I build an outer box made of foam board and heat it with a heating
pad or something to control the temperature.
link to the box and noise
http://www.1goss.com/s-box.jpg  
noise example, I had it most of the afternoon although normally during the
day it looks like it should.
http://www.1goss.com/noise.jpg

B. The first sensor I built several years back I donated to the local
elementary school when were moving.
It used the razor blade knife edge and steel all thread for the boom and did
not have the small aluminum rod I put in the new one.
It worked well but I wanted to build a better one this time round so I used
a ball bearing for the pivot point, added 
the aluminum rod to help with vertical stabilization and used square hollow
tubing for the boom.
Do you see anything wrong with this setup? I want criticism / suggestions if
you have any.
http://www.1goss.com/s-bearing.jpg
http://www.1goss.com/s-top.jpg
http://www.1goss.com/s-overall.jpg
http://www.1goss.com/s-boom.jpg
http://www.1goss.com/s-housing.jpg
 I had a bit of trouble getting the 25sec period and am not sure it is
correct and haven't had a recordable local or teleseismic event to compare
with the local 
Helicorder Displays.

C. Would a ball bearing at the top and all aluminum preform better than a
wire? and if  I use all wire what is the very best?

Thanks for your time Bryan S Goss


 

























Hello Bryan,

Can you show us 24 hours of data. Do the seismometer = support posts  go directly to the garage floor or are they on the = insulating mat. You can make small holes in the mat for the support posts if you have not = done that already. Your seismometer looks good so far. Good = work.

Gary

 

 

 

 

 

From:= psnlist-request@.............. [mailto:psnlist-request@............... = On Behalf Of Bryan Goss
Sent: Saturday, November 13, 2010 11:53 PM
To: psnlist@..............
Subject: lehman seismometer

 

I have built a new lehman seismometer and I have a few questions its been = several years since my last one and I have forgotten a lot.

A. I have a small outdoor building not temperature controlled thats why = I built the wooden box with insulation.
I am getting noise starting about 1:00am to about 9:00am
should I build an outer box made of foam board and heat it with a = heating pad or something to control the temperature.
link to the box and noise
http://www.1goss.com/s-box.jpg 
noise example, I had it most of the afternoon although normally during = the day it looks like it should.
http://www.1goss.com/noise.jpg

B. The first sensor I built several years back I donated to the local elementary school when were moving.
It used the razor blade knife edge and steel all thread for the boom and = did not have the small aluminum rod I put in the new one.
It worked well but I wanted to build a better one this time round so I = used a ball bearing for the pivot point, added
the aluminum rod to help with vertical stabilization and used square = hollow tubing for the boom.
Do you see anything wrong with this setup? I want criticism / = suggestions if you have any.
http://www.1goss.com/s-bearing.jpg
http://www.1goss.com/s-top.jpg
http://www.1goss.com/s-overall.jpg
http://www.1goss.com/s-boom.jpg
http://www.1goss.com/s-housing.jpg
 I had a bit of trouble getting the 25sec period and am not sure it = is correct and haven't had a recordable local or teleseismic event to = compare with the local
Helicorder Displays.

C. Would a ball bearing at the top and all aluminum preform better than = a wire? and if  I use all wire what is the very best?

Thanks for your time Bryan S Goss

 

=












[ Top ] [ Back ] [ Home Page ]