Hi all,

Last July I asked your advice in building a Lehman. Thanks to the
advice you gave me, I have completed the project. I will use Larry's
equipment to start recording in the near future.

Now I have to find a good location to place my Lehman. I have
two options: to place it in a separate room or in the crawlspace =

beneath the house.

There is not much room in the crawlspace (1 meter) and the soil
consists of sand and clay. Sometimes (after wet weather conditions over
a long period of time) there is also the problem of water in it.

I guess a pier will tilt due to the different soil conditions?

What do you suggest?

Thanks in advance,

Marchal van Lare
-Nieuwvliet, The Netherlands